Live +

Live +

  • Bedrooms

    1

  • Baths

    1

  • Footprint

    741 sq ft

Starting at:

$228,000 (+ tax)

  • One Full Bedroom
  • Full Kitchen, Including Appliances
  • Full Bathroom
  • Functional Living Room Space
  • Walk-in Closet Prepared for Washer Dryer
  • Built-in Soft Close Cabinetry
  • LED Ceiling & Ambient Lighting
  • Polished Concrete Floors
  • 9ft Ceilings
  • Corner Glazed, Aluminum Framed Glass

The Live + features an expanded floor plan of our Live model. More interior space, a walk in closet, plumbing for laundry, and an expanded living room make for a more livable experience.

Schedule a call

Customize your own living space

Exterior
Interior

Customize your own living space

Live +

Neutra

Midnight

Graystone

Live +

Musket Gray

Midnight

Accoya White

  • The Live + has been added by popular demand! This unit is just like our Live model but features an expanded floor plan of to allow for longer livability. More interior space, a walk-in closet, plumbing for laundry, and an expanded living room make for a more livable experience. Furnished with a full bathroom, full kitchen, sleek and modern lighting, aluminum glass sliding doors, mini-split cooling and heating systems, and optional metal or stucco exteriors. This addition will bring a tasteful modern look to your backyard or lot while adding tangible value to your lifestyle. This model can be built as the ultimate guest house or a second home for the true minimalist.

    • 741sf

      Livable
    • 38ft / 19.5ft / 10ft

      Dimensions L/W/H
    • 9 ft

      Interior Ceilings
    Schedule a call

    Construction Timeline Estimate:

    This timeline is based on our Live + model. Our projects start with a 30 day planning period. Upon proper planning, our team works to secure permit approval on your project. The permitting process can take anywhere from 2-3.5 months. The Live + requires about 4-5.5 months of on-site construction time outside of any unexpected delays.

    210

    days

    Planing

    30 days

    Permitting

    2-3.5 Months

    Construction

    4-5.5 Months